{
    "@context": "https://schema.org",
    "@type": "NewsArticle",
    "@id": "https://badiyaa.com/nasa-10-billion-moon-base-landers-clps-2/#article",
    "mainEntityOfPage": "https://badiyaa.com/nasa-10-billion-moon-base-landers-clps-2/",
    "headline": "NASA sets a $10 billion ceiling for Moon Base cargo landers; SpaceX and Blue Origin are 2 of 8 firms eligible",
    "description": "The 10-year deal guarantees no one that sum. The firm money so far is smaller, including $94 million for Blue Origin to land a nuclear-powered rover built from Mars rover spares.",
    "datePublished": "2026-11-10T01:45:00+00:00",
    "dateModified": "2026-11-10T01:45:00+00:00",
    "author": {
        "@type": "Organization",
        "name": "Badiyaa Editorial Desk",
        "url": "https://badiyaa.com/author/editorial-desk/"
    },
    "publisher": {
        "@type": "NewsMediaOrganization",
        "@id": "https://badiyaa.com/#organization",
        "name": "Badiyaa",
        "url": "https://badiyaa.com/",
        "logo": {
            "@type": "ImageObject",
            "url": "https://badiyaa.com/wp-content/uploads/2026/10/badiyaa-logo-color-600x60-1.png",
            "width": 600,
            "height": 60
        },
        "email": "badiyaavideo@gmail.com",
        "publishingPrinciples": "https://badiyaa.com/editorial-policy/",
        "correctionsPolicy": "https://badiyaa.com/corrections/",
        "actionableFeedbackPolicy": "https://badiyaa.com/contact/",
        "ownershipFundingInfo": "https://badiyaa.com/about/#ownership",
        "sameAs": [
            "https://www.facebook.com/profile.php?id=61595518283625",
            "https://www.instagram.com/badiyaa.com.ai/",
            "https://www.threads.net/@badiyaa.com.ai"
        ],
        "parentOrganization": {
            "@type": "Organization",
            "name": "Rezilient Digital",
            "url": "https://www.rezilientdigital.com/",
            "address": {
                "@type": "PostalAddress",
                "streetAddress": "Fl No 3, Nav Shyam Sadan, Plot No 38, Pestom Sagar, Chembur",
                "addressLocality": "Mumbai",
                "addressRegion": "Maharashtra",
                "postalCode": "400089",
                "addressCountry": "IN"
            },
            "sameAs": [
                "https://www.linkedin.com/company/rezilientdigital"
            ]
        }
    },
    "isAccessibleForFree": true,
    "inLanguage": "en-US",
    "wordCount": 712,
    "image": [
        "https://badiyaa.com/wp-content/uploads/2026/11/concept-for-sustained-lunar-surface-operations-at-the-moon-base-stmd-exteriorlun-scaled.webp",
        "https://badiyaa.com/wp-content/uploads/2026/11/concept-for-sustained-lunar-surface-operations-at-the-moon-base-stmd-exteriorlun-1024x576.webp"
    ],
    "articleSection": "Science",
    "keywords": "Blue Origin, CLPS, Moon Base, NASA, SpaceX",
    "articleBody": "NASA has picked eight companies, SpaceX and Blue Origin among them, to compete for up to $10 billion in robotic Moon deliveries over 10 years, the agency announced on November 7 at an air show at Kennedy Space Center in Florida. That figure is a ceiling on a shared contract, so no company has been handed $10 billion, and none is promised a single flight yet. The other six are Northrop Grumman Space Systems, Lockheed Martin Space, Voyager Technologies, ispace-U.S., Intuitive Machines and Firefly Aerospace. Under the framework, called CLPS 2, each may bid to build and fly landers carrying NASA science, technology and base hardware to the lunar surface. &#8220;We are building the Moon Base mission by mission,&#8221; NASA Administrator Jared Isaacman said. How the money is structured CLPS stands for Commercial Lunar Payload Services, and its model is simple: NASA buys a delivery instead of owning the lander. The legal form here is an indefinite-delivery, indefinite-quantity contract, which sets an upper limit and leaves individual missions to be ordered and competed one at a time. Spread evenly, $10 billion over a decade would be $1 billion a year at most. The first CLPS contract, opened in 2018 with a $2.6 billion cap, has just been raised to $4.2 billion. The new ceiling is about 3.8 times the original and 2.4 times the raised one. The older contract runs through November 2028, with five more years to finish deliveries already awarded. Firm orders in the same announcement look quite different: Blue Origin: $94 million, plus an option worth $140 million based on performance, to land the PROMISE rover at the South Pole on its Mark 1 lander. SpaceX: a task order to launch communications satellites on a Starship to the region between Earth and the Moon in 2028. NASA gave no separate price. Arrow Science and Technology, Blue Origin and Impulse Space: six launch and transfer task orders worth about $1.3 billion combined. Those orders also cover what flies first. The CAPSTONE 02 spacecraft, targeted for launch in 2027, will rehearse navigation and formation flying in lunar orbit, and four MoonFall drones are due at the South Pole in 2028 to map possible landing sites in detail. A nuclear rover built from Mars spares PROMISE, short for Polar Rover for Observation, Mapping, and In-Situ Exploration, is the most striking item on the list. NASA&#8217;s Jet Propulsion Laboratory will assemble the six-wheeled rover from spare flight parts and engineering test models left over from Curiosity and Perseverance, a choice NASA says cuts cost and shortens the schedule. Nuclear power is the point. Solar panels are of little use through long lunar nights or in permanently shadowed craters, which is where ice is thought to hide. PROMISE will carry a drill reaching about 3 feet down, along with spectrometers and temperature and radiation sensors. NASA is targeting a late 2028 launch and an 18-month mission. All of this feeds a three-phase plan for an outpost near the South Pole: robotic scouting and access through 2029, first infrastructure from 2029 to 2032, and a place for astronauts to live and work after that. Program manager Carlos García-Galán said the aim is &#8220;establishing a permanent outpost on the lunar surface.&#8221; The limits of the announcement Landing on the Moon remains hard for commercial firms, and the record under the first contract shows it. Four CLPS missions have flown. Peregrine in January 2024 failed before it could attempt a landing, IM-1 touched down but tipped, Blue Ghost in 2025 was the first fully successful mission, and IM-2 tipped on landing soon after and did little science. That is one clean success in four attempts. The new framework does not change the physics. It adds bidders and budget room, and NASA still has to order missions, fund them and see hardware arrive. Being eligible is a license to compete for work, and several companies on the list have yet to land anything on the Moon under this program. The next test of the model comes sooner than 2028. Blue Origin&#8217;s Mark 1 lander Endurance, Voyager&#8217;s Griffin-1 and Intuitive Machines&#8217; IM-3 are all in the queue, and NASA expects a separate solicitation for fully integrated lunar power systems in early 2027. Further reading NASA: Moon Base Wikipedia: Commercial Lunar Payload Services Illustrative image. Image: NASA, Public domain via Wikimedia Commons This article was produced with AI assistance and reviewed by our Editorial Desk. How we work.",
    "markdown": "https://badiyaa.com/nasa-10-billion-moon-base-landers-clps-2.md"
}